Commit Graph
8 Commits
Author SHA1 Message Date
robbond 1d92aa0b07 experiment: create single return-to-work handoff 2026-08-06 15:37:12 +01:00
robbond b959cfa7a7 experiment: create task-specific context packs 2026-08-06 15:30:14 +01:00
robbond 51f0c11bc8 experiment: separate current principles from architectural aspirations 2026-08-06 15:07:06 +01:00
robbond a4bbe0ef3f experiment: separate ui mock reference from deferred backlog 2026-08-06 14:47:34 +01:00
robbond 78c98fb973 experiment: review deferred project documents
Experiment 30 classified two deferred documents against verified current state:
- architectural-principles.md → keep as task-specific reference (6 current, 4 aspirational, 3 duplicates)
- backlog info.md → retain temporarily pending revision (mixed mock fixtures + deferred UX planning)
Neither moved to archive — both contain material with potential near-term utility.
Created docs/document-role-review.md with evidence, routing test, and return-to-work note.
2026-08-06 14:33:10 +01:00
robbond 97e4f3029e experiment: archive historical project documents 2026-08-06 14:24:52 +01:00
robbond 354ba26aad experiment: verify current project state against implementation 2026-08-06 14:16:57 +01:00
robbond 61c8a3adbd experiment: create current project state entry point 2026-08-06 14:06:20 +01:00